CHINHOYI – The Municipality of Chinhoyi is stepping up road rehabilitation and maintenance works, with reconstruction and surfacing projects underway on several roads as part of efforts to improve the city’s road network.
Chaedza-Mhofu 1 Road, which branches off the Chegutu–Chinhoyi Highway, passes through Machawa Tuck-Shops and extends to Mzimba Shopping Centre, where it intersects with Chaedza Road, is undergoing full reconstruction.
In a statement, the Municipality of Chinhoyi said the project involved rebuilding the road up to the final surface finish, incorporating drainage works to improve stormwater management, durability and accessibility.
“The project involves the full reconstruction of the road to surface finish, incorporating drainage works to improve stormwater management, road durability and accessibility,” said the local authority.
Meanwhile, rehabilitation works on Herbert Chitepo Road have advanced to the priming stage, marking a significant step towards final surfacing.
The municipality said the ongoing works formed part of its efforts to rehabilitate roads, improve the city’s road network and deliver safer, more durable roads.
In addition to reconstruction and surfacing, the local authority is undertaking road shouldering works to reinforce road edges, prevent gradual narrowing caused by erosion and wear, and preserve the condition and usability of existing roads.
The municipality said the maintenance intervention was necessary to protect road infrastructure and promote safer and more durable roads.
The combined projects are expected to improve connectivity, accessibility and road safety while extending the lifespan of Chinhoyi’s road network.